| Proyecto |
Cliente |
Descripción Objeto y Alcance |
Ubicación |
Ton. |
Fecha |
Monto |
|
|
| Project |
Customer |
Description, Object, Ability |
Ubication |
Ton. |
Date |
$ |
|
|
| Robert
& Schaefer Company |
Hamaca Crude Upgrader Project |
Petrolera Ameriven
S:A. Coke and Sulfur Handling |
Jose-Edo. Anzoategui |
|
2001 |
|
|
|
| SINCOR
Uptream Facilities Project |
SINCOR -River Consulting, Inc |
Suministro de galerias tubulares
/ Supply of Tubular Conveyor Galleries |
Jose - Edo. Anzoategui |
5115,5 |
2001 |
|
|
|
| PDVSA |
Petróleos de venezuela, PDVSA
(Bariven) |
Fabricación 1KO Drum y 6
Separadores Estampado ASME e Internos Vortex Tube Cluster |
Maraibo - Edo. Zulia |
|
2001 |
|
|
|
| SINCOR
Uptream Facilities Project |
SINCOR -River Consulting, Inc |
Fabricación de 86 Pilotes de 24
a 42" ø / Duck Piles |
Jose - Edo. Anzoategui |
1081,5 |
2001 |
|
|
|
| Techint
- Sidor |
Techint - Sidor |
Fabricación Estructuras
Metálicas |
Edo. Bolívar |
35 |
2001 |
|
|
|
| Aceria
Planchones -Sidor |
Rolini Constructors, C.A. |
Fabricación de Ductos 150 Ton / 150 Mt Ducts |
Edo. Bolívar |
150 |
2000-2001 |
|
|
|
| GBC
/Sincor Project |
Rolini Constructors, C.A. |
Fabricación de 70 Ton de
soportes / 70 MT Piping Support |
Edo. Anzoategui |
70 |
2000 |
|
|
|
| Caruachi |
Consorcio Dravica |
Vigas Carrileras |
Edo. Bolívar |
|
2000 |
|
|
|
| Caruachi |
Consorcio Dravica |
Fabricación 70 Ton. Planchas
Encofrado/44 MT Plates |
Edo. Bolívar |
70 |
2000 |
|
|
|
| Inelectra
/Sincor Project |
Rolini Constructors, C.A. |
Fabricación de 44 Ton de
soportes / 44 MT Piping Support |
Edo. Anzoategui |
44 |
2000 |
|
|
|
| Cerro
Negro Project |
Rolini Constructors, C.A. |
Fabricación de tres (3) tanques
API / (3) API Tanks |
Jose - Edo. Anzoategui |
|
2000 |
|
|
|
| Vhicoa |
Vhicoa |
Plataformas de Pipe Rack |
Edo. Bolivar |
123 |
1999-2000 |
|
|
|
| Sincor
Uptream Facilities Project |
SINCOR |
Supply of Direct Fired Heaters
(2) |
Edo. Anzoategui |
|
1998-99 |
$7.000.000 |
1 |
|
| Saline
Water Conversion Corporation de Arabia Saudita |
Consorcio Ansaldo - Yuksel |
Suministro de 26 Recipientes a
Presión 32, 36, 19- 22, 24,14 - 44,
48, 25 Thickness 24, 36, 48 Espesores |
Arabia Saudita |
1350 |
1996-1998 |
$4.000.000 |
2 |
|
| Saline
Water Conversion Corporation of Saudi Arabia |
Ansaldo - Yuksel – Consortium |
Supply of 26 Pressure Vessels 24, 36, 48 thickness |
Saudi Arabia |
|
|
|
2 |
|
| Caribbean
ISPAT – DR3 Project |
Techint Italimpianti |
Suministro, Fabricación,
Transporte y Montaje de 3 equipos de Manejo de Materiales: Cargador,
Descargador, Reclamador |
Trinidad & Tobago |
1750 |
1997-1999 |
$5.000.000 |
3 |
|
| Caribbean
ISPAT – DR3 Project |
Techint Italimpianti |
Supply, Fabrication, Transport
and Erection of Shipunloader, Shiploader, Stacker Reclaimer |
Trinidad & Tobago |
|
|
|
3 |
|
| Proyecto
Veneston Woodchip Mill |
Venepal Ston – Veneston |
Fabricación y Montaje del
Sistema de Cinta Transportadora – Planta Astillas |
Pta. Piedra Edo. Monagas |
|
1997-1998 |
$7.000.000 |
4 |
|
| Veneston
Woodchip Mill & Export Facility Project |
Venepal Ston – Veneston |
CC-05 Structural Mechanical
Conveyor System |
Punta de Piedra Port- Monagas State |
|
|
|
4 |
|
| Proyecto
Orinoco Iron |
Orinoco Iron, c.a. |
Estructura Metálica del Edificio
de briqueteadoras del Proyecto Orinoco Iron. |
Zona Industrial Matanzas- Edo.
Bolívar |
3542 |
1997-1999 |
$6.000.000 |
5 |
|
| Orinoco
Iron Project |
Orinoco Iron, c.a. |
Briquetter Building Steel
Structure |
Matanzas Industrial Area |
|
|
|
5 |
|
| Proyecto
Veneston Chip Mill |
BMH Wood Technology |
Fabricación de dos Cargadores de
Astillas de Madera |
Puerto de Piedra - Edo. Monagas |
|
1997-1998 |
$3.000.000 |
6 |
|
| Veneston
Chip Mill Project |
BMH Wood Technology |
Fabrication of two Shiploaders |
Punta de Piedra Port- Monagas State |
|
|
|
6 |
|
| Proyecto
de Cestas de Anodos |
C.V.G. Venalum |
Suministro, Fabricación y
Transporte de 650 Cestas para transportar anodos |
Zona Industrial Matanzas- Edo.
Bolívar |
|
1998 |
|
7 |
|
| Anode
Shells Project |
C.V.G. Venalum |
Suuply,
Fabricaction and Transport of 650 Anode Shells |
Zona Industrial Matanzas- Bolívar
State |
|
|
|
7 |
|
| Estación
de Flujo ORC-4 |
PDVSA – Oil y Gas |
Diseño, Fabricación, Inspección,
Pruebas y Traslado de un separador de prueba, un despojador de líquido y un
mechero. |
Edo. Anzoategui |
|
1998 |
|
8 |
|
| Flow
Estation ORC-4 |
PDVSA – Petroleum & Gas |
Design,
Fabrication, Test and Traslate of One
Test Separator, One Liquid Despoiler and Fire Tube |
Anzoategui State |
|
|
|
8 |
|
| Proyecto
Cerro Negro |
Natco |
Separadores Electrostáticos |
Jose, Edo. Anzoategui |
|
1998 |
$700.000 |
9 |
|
| Cerro
Negro Project |
Natco |
Three
Phase Separator |
Jose, Anzoategui State |
|
|
|
9 |
|
| Grundartangi
Reduction Plant |
K-Home Engineering Ltd– Nordural |
Suministro y Fabricación de 61 Cascos de Celdas |
Islandia |
|
1997-1998 |
$3.000.000 |
10 |
|
| Grundartangi
Reduction Plant |
K-Home Engineering Ltd– Nordural |
Supply and Assembly of 61 Pot Shell |
Iceland |
|
|
|
10 |
|
| Estación
de Flujo Barua |
PDVSA – Petróleo y Gas – Bariven
Oriente |
Fabricación y Suministro de
Separadores depuradores y calentadores. |
Bachaquero – Edo. Anzoategui |
|
1998 |
$1.000.000 |
10 |
|
| Barua Flow Estation |
PDVSA – Oil & Gas – Bariven
Oriente |
Fabrication and Supply of
Separator and Heaters. |
Bachaquero – Anzoategui St. |
|
|
|
10 |
|
| Terminal
de Almacenamiento - Proyecto TAEJ -
Fase II |
Corpoven S.A. Filial de Petróleos
de Venezuela (PDVSA) |
Construcción de Virolas
Metálicas de acero ø 42”x 3mts de
largo, pintadas. Según Normas API (R.P.) 2 AWSD/2B para acero estructural
A-36, Grupo 1, Clase C |
Jose - Edo. Anzoategui |
|
1997 |
$7.000.000 |
11 |
|
| Final
Storage - Project: TAEJ- Phase II |
Corpoven S.A. (Subsidiary of PDVSA) |
Construction
of Steel Duck Piles ø 42” x 3 mts.
Painting according API (R.P.) 2 AWSD/2B Structural Steel A-36 Standards. |
Jose - Anzoategui State |
|
|
|
11 |
|
| Descargados
Bauxita |
C.V.G. Bauxilum |
Mantenimiento Descargador
Continuo de Bauxita. |
Zona Industrial Matanzas |
|
1997 |
|
12 |
|
| Continuous
Barge Unloading |
C.V.G. Bauxilum |
Continuous Barge Unloading
Maintenance |
Matanzas Industrial Area |
|
|
|
12 |
|
| Terminal
de Almacenamiento - Proyecto TAEJ -
Fase II (Extension) |
Corpoven S.A. Filial de Petróleos
de Venezuela (PDVSA) |
Construcción
de virolas metálicas de acero Según
Normas API (R.P.) 2 AWSD/2B para acero estructural A-36, Grupo 1, Clase C |
Jose - Edo. Anzoategui |
|
1997 |
|
13 |
|
| Final
Storage - Project: TAEJ - phase II (Extention) |
Corpoven S.A. (Subsidiary of PDVSA) |
Construction
of Steel Duck Piles According API (R.P.) 2 AWSD/2B Structural Steel A-36
Standards. |
Jose - Anzoategui State |
|
|
|
13 |
|
| Hornos
calentadores de Acción directa para Crudo hidratado. |
Corpoven S.A. Filial de Petróleos
de Venezuela (PDVSA) |
Diseño térmico, mecánico,
fabricación y puesta en marcha de 3 hornos calentadores de acción directa. |
Edo. Azoategui |
150 |
1996 |
$3.000.000 |
14 |
|
| Crude Oil heater Separator |
Corpoven S.A. (Subsidiary of PDVSA) |
Thermic, mechanical design,
fabrication and put on march of 3 crude oil heater separator. |
Anzoategui State |
|
|
|
14 |
|
| Tanques
KOD |
Aquakrystal Ingeniería – Aquinkca
C.A. |
Reparación y Modificación de
Tanques KOD ASME |
Zona Industrial Matanzas |
|
1997 |
|
15 |
|
| Storage
Tank |
Aquakrystal Ingeniería C.A. |
Fixes and Modification of Tanks
KOD ASME. |
Industrial Matanzas Area |
|
|
|
15 |
|
| Chutes
(Tolvas) - Sidor |
Consorcio Vepica-Rivaco
Fochi-Ensadof |
Fabricación de 8 chutes |
Sidor- Edo. Bolívar |
|
1997 |
|
16 |
|
| Chutes -
Sidor |
Consortium Vepica-Rivaco
Fochi-Ensadof |
Fabrication
of 8 Chutes |
Sidor- Bolívar State |
|
|
|
16 |
|
| Fabricación
de Estructuras Metálicas - Oritupano |
Foster Wheeler - Perez Companc. |
Suministro, Fabricación y
Entrega de Estructuras Metálicas para el Proyecto Perez Compac en Oritupano |
Oritupano – Edo. Anzoategui |
100 |
1996 |
|
17 |
|
| Fabrication
of Steel Structures - Orirupano |
Foster Wheeler - Perez Companc. |
Supply, Fabrication and Delivery
of Steel Structure for Oritupano Project. |
Oritupano - Anzoategui State |
|
|
|
17 |
|
| Proyecto
terminal de Almacenamiento y Embarque de Crudo - Jose. |
Corpoven S.A. Filial de Petróleos de Venezuela (PDVSA) |
Fabricación de 298 Pilotes de
42”de Diámetro externo según normas API (R.P.) 2 AWSD/2B
Acero A-36 1” espesor. |
Edo. Anzoategui |
10980 |
1995-1996 |
|
18 |
|
| Terminal
Storage Project and Shipment of Crude
Oil – Corpoven |
Corpoven S.A. - PDVSA Subsidiary |
Fabrication of Steel Duck Piles
ø 42” x57 mts. according API (R.P.) 2 AWSD/2B Structural
Steel A-36 Standards. 1”thickness. |
Anzoategui States |
|
|
|
18 |
|
| Fabricación
Hornos de Homogeneización |
Pianmeca Laminati Aluminio
Gallardi |
Fabricación de Hornos de
Homogeneización |
Edo. Bolívar |
|
1995 |
|
19 |
|
| Ovens
Fabrications |
Pianmeca Laminati Aluminio
Gallardi |
Ovens Fabrications |
Bolívar States |
|
|
|
19 |
|
| Escaleras,
plataformas y soportes para recipientes a presión |
Venezco, Inc. |
Fabricación y Montaje de escaleras, plataformas y
soportes para Recipientes a Presión. |
Edo. Bolívar |
|
1995 |
|
20 |
|
| Staircases,
platfortms and supports for Pressure Vessels |
Venezco, Inc. |
Fabrication and Assembly of
Staircases, platforms and supports to Pressure Vessels |
Bolivar State |
|
|
|
20 |
|
| Descargador
Continuo de Bauxita |
C.V.G. Bauxilum |
Fabricación y Montaje del
descargador continuo de bauxita |
Zona Ind. Matanzas. Edo. Bolívar |
|
1995 |
|
21 |
|
| Port
Unloading Facility |
C.V.G. Bauxilum |
Fabrication and Assembly of Continuous Barge Unloading |
Bolivar State |
|
|
|
21 |
|
| Liceo
Guamo |
Ingenieria Titano |
Fabricación y montaje de
estructuras del Liceo |
Edo. Bolívar |
|
1995 |
|
22 |
|
| High
School - Guamo |
Ingenieria Titano |
Fabrication
and Assembly structures for Guamo - High School |
Bolivar State |
|
|
|
22 |
|
| Edificio
Cepet |
Ingeniería Tittano |
Fabricación y Montaje de
Estructuras del edificio Cepet |
Edo. Bolívar |
|
1994 |
|
23 |
|
| Cepet Building |
Ingenieria Titano |
Fabrication and Assembly
Structures for Cepet Building |
Bolívar States |
|
|
|
23 |
|
| Soporte
y Malla vibratoria y base de codo 8” |
Cadre Resources de Venezuela |
Soporte y Malla vibratoria y
base de codo 8” |
Edo. Bolívar |
|
1994 |
|
24 |
|
| Support
and vibratory mesch and elbow base 8” |
Cadre Resources of Venezuela |
Support and vibratory mesch and
elbow base 8” |
Bolivar State |
|
|
|
24 |
|
| Techo de
las Oficinas del Campo Deportivo |
Ingeniería Titano |
Fabricación y Montaje de las
estructuras del techo de las oficinas del campo deportivo |
Edo. Bolívar |
|
1994 |
|
25 |
|
| Ceiling
of Office - Sport Gym. |
Ingenieria Titano |
Fabrication and Assembly of
Structures for Ceiling Offices Sport Gym. |
Bolivar State |
|
|
|
25 |
|
| Descargador
Continuo de Gabarras |
Italimpianti / Interalumina |
Suministro, Fabricación y
Montaje de un Descargador Continuo de Gabarras |
Muelle Interalumina - Edo. Bolívar |
2400 |
1992-1993 |
|
25 |
|
| Continuous
Barge Unloading |
Italimpinati / Interalumina |
Supply, Fabrication and Assembly
of one Continous Barge Unloading |
I/A
Unloading P. |
|
|
|
25 |
|
| Planta
de Pellas de Ferrominera Orinoco C.A. |
Kobe Steel / Marubeni |
Fabricación de Acero estructural
para Planta de Pellas - Ferrominera Orinoco, C.A. |
Zona Ind. Matanzas - Edo. Bolívar |
3150 |
1992/93 |
$12.000.000 |
26 |
|
| Pellets
Plants of Ferrominera Orinoco C.A. |
Kobe Steel / Marubeni |
Fabrication of Steel Structure
to Pellets Plants - Ferrominera Orinoco, C.A. |
Bolivar State |
|
|
|
26 |
|
| Planta de
Pellas de Ferrominera Orinoco, C.A: |
Kobe Steel/Marubeni |
Fabricación de equipos, tolvas,
calentadores, elevadores, cangilones, tanques, transportadores para la Planta
de Pellas |
Zona Ind. Matanzas - Edo. Bolívar |
850 |
1992-1993 |
|
26 |
|
| Pellets
Plant of Ferrominera Orinoco, C.A. |
Kobe Steel/Marubeni |
Fabrication of equipment,
bins, heaters, Bucket elevators,
tanks, transporter for Pellets Plant. |
Bolivar States |
|
|
|
26 |
|
| Ascensor
área 32 de molienda - Planta de
Alúmina -Interalúmina |
C.V.G. Interamericana de Alúmina
C.A. |
Suministro, Fabricación y
Montaje de Estructura de acero para el Ascensor del área 32 de Molienda. |
Zona Ind. Matanzas - Edo. Bolívar |
60 |
1991-1992 |
|
27 |
|
| Elevator
Area 32 of Grinding - Alumina Plant |
C.V.G. Interamericana de Alúmina |
Supply, Fabrication and Assembly
of Steel Structure for the elevator - area 32 of grinding |
Bolivar State |
|
|
|
27 |
|
| Vagones Mineraleros |
Conferroven - C.V.G. Ferrominera
Orinoco, C.A. |
Suministro y Fabricación de 150
paredes laterales para 300 vagones |
Edo. Bolívar |
300 |
1992 |
|
27 |
|
| Hoppers
Cars |
Conferroven - C.V.G. Ferrominera
Orinoco, C.A. |
Supply and Fabrication of 150
lateral walls for 300 Hoppers cars |
Bolivar States |
|
|
|
27 |
|
| Proyecto
Infragas |
Dresser de Venezuela |
Fabricación de Perfiles
Tubulares de sección cuadrada para el Proyecto Infragas |
|
192 |
1991 |
|
28 |
|
| Ingrafas
Project |
Dresser de Venezuela |
Fabrication
of Piping Profiles - Squared section
to Infragas Project |
|
|
|
|
28 |
|
| Coquificación
Retardada de la Refinería de Amuay |
TecnoFluor - Lagoven |
Fabricación de 8 Recipientes a
Presión en material HIC . |
Edo. Falcón |
70 |
1991-1992 |
|
28 |
|
| Amuay
Refinery |
Lagoven |
Fabrication of 8 Pressure
Vessels in HIC material |
Falcon State |
|
|
|
28 |
|
| Planta
de Fundición de Aluminio |
C.V.G. Aluminio del Caroní, S.A.
- Alcasa |
Fabricación y Montaje de
Estructuras para la Nave Industrial de Fundición II para la planta de
Fundición de Aluminio |
Zona Ind. Matanzas - Edo. Bolívar |
1300 |
1988-1989 |
|
29 |
|
| Aluminium
Smelting Plant . |
C.V.G. Alumnio del Caroní, S.A.-
Alcasa |
Fabrication
and Assembly of Structure for Industrial Smelting Plant |
Bolivar State |
|
|
|
29 |
|
| Reducción
V Línea Hydroaluminium Technology |
C.V.G. Venalum |
Suministro y Fabricación de 182
Pot Super-Estrurura |
Zona Ind. Matanzas - Edo. Bolívar |
|
1988-1989 |
|
30 |
|
| V
Reduction Line 280000 Amp Hydroaluminium Technology |
C.V.G. Venalum |
Supply and Fabrication of 182 -
Pot Superstructure |
Bolivar State |
|
|
|
30 |
|
| Planta de
Reducción Directa Proceso Midrex |
Sidecar - Sivensa |
Fabricación de ductos,
recipientes a presión, tubería a presión, chimeneas, chutes, tolvas y equipos
para planta reducción directa. |
Edo. Bolívar |
1300 |
1989-1990 |
|
30 |
|
| Direct
Reduction Plant Process |
Sidecar- Sivensa |
Fabrication of Duct, Pressure
Vessels, Pressure Piping, Chimneys, Chutes, Bins and Equipment for Direct
Reduction Plant. |
Bolivar State |
|
|
|
30 |
|
| Planta
de Recuperación de Cabos Telefónicos y Almacenamiento de Coque |
C.V.G. Carbones del Orinoco C.A.
– Carbonorca |
Fabricación y montaje de ductos,
chutes, silos chimeneas, estructuras metálicas y montaje mecánico de equipos |
Edo. Bolívar |
498 |
1990 |
|
31 |
|
| Plant of
Ends Recovery Telephonic and Coke Storage |
C.V.G. Carbones del Orinoco C.A.
– Carbonorca |
Fabrication and Assembly of
Ducts, Chutes, Storage Silos, Chimneys, Steel Structure and Mechanic Assembly
of Equipments. |
Bolivar States |
|
|
|
31 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OFICINA PRINCIPAL Y
PLANTA / MAIN OFFICE AND PLANT
Calle Pardillo – Zona Industrial Matanzas – Puerto Ordaz, Ciudad Guayana -
Estado Bolívar, Venezuela
Telefono / Telephone: (58 0286)
9940664 / 9940681 - Fax: (58
0286) 9942050
OFICINA COMERCIAL / COMERCIAL OFFICE
Calle Las Flores con Paraiso – Torre Ofigarel, Oficina 2-B Sabana Grande,
Caracas, Venezuela
Telefono / Telephone: (58 0212)
7611515 / 7616570 - Fax: (58
0212) 7612478
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|